Cleator Moor, Cumbria
Our client required a detailed inspection on the condition of the Primary Tanks at Cleator Moor WwTw.
Due to vital role the two tanks play in water cleansing the Primary Tanks had to be drained individually, resulting in a two day site visit.
The brief was to conduct structural surveys of Primary Tanks 1 & 2 , and take concrete core samples for carbonation and chloride contamination
- at August 15, 2013
- 0 comments